AS 2327 Composite Beam Design — Overview
Composite steel-concrete beams use shear connectors to join a steel beam to a concrete slab, creating a T-section that acts as a single structural element. The concrete slab resists compression in sagging bending, while the steel beam carries tension — each material used where it performs best. This results in 30-50% greater strength and 40-60% greater stiffness compared to a non-composite steel beam of the same size.
AS 2327:2017 governs composite beam design in Australia, working in conjunction with:
- AS 3600:2018 — Concrete Structures (concrete slab design)
- AS 4100:2020 — Steel Structures (steel beam design)
- AS 1170.0/1/2/4 — Structural Design Actions (loads)
- AS 1554.6 — Structural Steel Welding, Part 6: Welding studs for shear connection (stud welding)
- AS/NZS 3679.1 — Hot-rolled steel sections
Shear Stud Connectors (AS 2327 Clause 3.2)
Stud Types
Shear stud connectors are welded to the top flange of the steel beam through the steel deck (decking) using a drawn-arc welding process per AS 1554.6:
| Stud Diameter (mm) | Height (mm) | Ultimate Strength f_uc (MPa) | Characteristic Capacity (kN) |
|---|---|---|---|
| 13 | 65 | 450 | 42 |
| 16 | 75 | 450 | 63 |
| 19 | 100 | 450 | 90 |
| 22 | 125 | 450 | 119 |
| 25 | 150 | 450 | 150 |
Stud steel is typically Grade 450 (f_uc = 450 MPa) per AS 1554.6.
Design Shear Capacity of Studs (Clause 3.2.3)
The design shear capacity of a single stud connector in a solid slab is:
phi-Vsc = phi ÃÂà0.65 ÃÂà(d_sÃÂò ÃÂàâÃÂÃÂ(f_c ÃÂàE_c)) / (1.3 ÃÂàf_uc ÃÂàA_s)
where:
phi = 0.80 (capacity factor for connectors)
d_s = stud shank diameter (mm)
f_c = concrete compressive strength (MPa)
E_c = concrete elastic modulus = 0.043 ÃÂàÃÂÃÂ^1.5 ÃÂàâÃÂÃÂ(f_c) (MPa)
A_s = cross-sectional area of stud = pi ÃÂàd_sÃÂò / 4 (mmÃÂò)
f_uc = ultimate tensile strength of stud steel (MPa)
The 0.65 factor accounts for the ductility requirement (studs must be ductile enough to redistribute load). The formula gives the minimum of:
- Concrete crushing capacity around the stud
- Stud shank shear capacity
For a 19 mm stud in 32 MPa concrete: f_c = 32 MPa, E_c = 0.043 ÃÂà2400^1.5 ÃÂàâÃÂÃÂ32 = 0.043 ÃÂà117,576 ÃÂà5.657 = 28,600 MPa phi-Vsc = 0.80 ÃÂà0.65 ÃÂà(19ÃÂò ÃÂàâÃÂÃÂ(32 ÃÂà28,600)) / 1000 = 0.80 ÃÂà0.65 ÃÂà(361 ÃÂàâÃÂÃÂ915,200) / 1000 = 0.80 ÃÂà0.65 ÃÂà(361 ÃÂà956.7) / 1000 = 0.80 ÃÂà0.65 ÃÂà345,368 / 1000 = 179.6 kN per stud
Reduction for Deck Profiles
When studs are welded through steel decking, the capacity is reduced by:
phi-Vsc_reduced = phi-Vsc ÃÂÃÂ k_deck
k_deck = 0.85 ÃÂà(b_r / h_s) ÃÂà(h_sc / h_s - 1.0) âÃÂä 1.0
where:
b_r = average width of deck rib (mm)
h_s = height of deck rib (mm)
h_sc = stud height after welding (mm)
For trapezoidal deck with 60 mm rib, 140 mm average rib width, 19 mm studs (100 mm height): k_deck = 0.85 ÃÂÃÂ (140/60) ÃÂÃÂ (100/60 - 1.0) = 0.85 ÃÂÃÂ 2.33 ÃÂÃÂ (1.667 - 1.0) = 0.85 ÃÂÃÂ 2.33 ÃÂÃÂ 0.667 = 1.32 But capped at 1.0, so k_deck = 1.0 (no reduction for this deck profile with adequate stud length).
Effective Flange Width (AS 2327 Clause 3.3)
The effective width of the concrete flange in composite action is:
b_eff = b_ei + b_e2 + b_e3
where:
b_ei = minimum of L_e / 8, S_i / 2, and (D_c ÃÂÃÂ 10 + t_s)
L_e = distance between points of contraflexure (mm)
S_i = distance to adjacent beam centreline on side i (mm)
D_c = depth of composite section (mm)
t_s = slab thickness (mm)
For internal beams, b_eff is the sum of half the effective width on each side. For edge beams, the external effective width is limited to b_e1 + b_e2 where b_e2 is the overhang.
For a 12 m span internal beam with beams at 3.0 m spacing: b_ei = min(12000/8, 3000/2) = min(1500, 1500) = 1500 each side b_eff = 1500 + 1500 = 3000 mm
For an edge beam with 1.5 m overhang: b_ei = min(1500, 750) = 750 external, 1500 internal b_eff = 750 + 1500 = 2250 mm
Moment Capacity — Sagging Bending (AS 2327 Clause 4.3)
In sagging (positive) bending, the concrete slab is in compression and the steel beam is primarily in tension. The design moment capacity depends on the degree of shear connection and the location of the plastic neutral axis (PNA).
Full Shear Connection
With full shear connection (sufficient studs to develop the full plastic moment):
Case 1 — PNA in slab:
C_c = 0.85 ÃÂÃÂ f_c ÃÂÃÂ b_eff ÃÂÃÂ t_c
T_s = A_s ÃÂÃÂ f_y
If C_c âÃÂÃÂ¥ T_s: PNA in slab, M_s = T_s ÃÂà(d/2 + t_c - a/2)
Case 2 — PNA in steel flange:
If C_c < T_s: PNA in steel section
C_f = (T_s - C_c) / 2 (flange compression required for equilibrium)
where:
C_c = concrete compression force (N)
T_s = steel tension force = A_s ÃÂÃÂ f_y (N)
t_c = depth of concrete slab above deck ribs (mm)
a = depth of stress block = T_s / (0.85 ÃÂÃÂ f_c ÃÂÃÂ b_eff) (mm)
For a 530UB92.4 (As = 11,800 mmÃÂò, fy = 300 MPa, d = 528 mm) with 32 MPa concrete, 3000 mm effective width, 120 mm slab above deck:
T_s = 11,800 ÃÂà300 = 3,540 kN C_c = 0.85 ÃÂà32 ÃÂà3000 ÃÂà120 = 9,792 kN Since C_c >> T_s âÃÂàPNA is in the slab.
a = 3,540,000 / (0.85 ÃÂà32 ÃÂà3000) = 3,540,000 / 81,600 = 43.4 mm M_s = 3,540,000 ÃÂà(528/2 + 120 - 43.4/2) = 3,540,000 ÃÂà(264 + 120 - 21.7) = 3,540,000 ÃÂà362.3 = 1,283 ÃÂà10âÃÂö NÃÂ÷mm = 1,283 kNÃÂ÷m
Without composite action, the bare steel beam capacity: phi-Ms = 0.90 ÃÂà300 ÃÂà2,370 ÃÂà10ÃÂó / 10âÃÂö = 640 kNÃÂ÷m
Composite action increases moment capacity by 2.0ÃÂà(1,283 vs 640 kNÃÂ÷m).
Partial Shear Connection
When fewer studs are used (partial shear connection), the moment capacity is reduced:
N_sc = number of studs provided between supports
N_scf = number of studs required for full shear connection
eta_c = N_sc / N_scf (degree of shear connection, 0.4 âÃÂä eta_c âÃÂä 1.0)
M_sp = M_s_bare + eta_c ÃÂÃÂ (M_s_full - M_s_bare)
AS 2327 Clause 4.3.3 requires that the degree of shear connection eta_c be at least 0.4 for beams with span âÃÂä 20 m. For longer spans, min eta_c = 0.5. This minimum ensures acceptable ductility and prevents brittle connector failure.
Vertical Shear Capacity (AS 2327 Clause 4.4)
The vertical shear capacity of a composite beam is based on the steel web alone:
phi-Vv = phi ÃÂÃÂ 0.60 ÃÂÃÂ f_y ÃÂÃÂ A_w ÃÂÃÂ k_v
where:
phi = 0.90 (same as AS 4100)
A_w = web area = d ÃÂàt_w (mmÃÂò)
t_w = web thickness (mm)
k_v = web slenderness reduction factor per AS 4100 Clause 5.11
AS 2327 does not attribute shear capacity to the concrete slab — the steel section must resist all vertical shear. For the 530UB92.4: A_w = 528 ÃÂà10.2 = 5,386 mmÃÂò phi-Vv = 0.90 ÃÂà0.60 ÃÂà300 ÃÂà5,386 / 1000 = 872 kN
Shear-Moment Interaction (Clause 4.4.3)
When the design shear V* exceeds 0.6 ÃÂÃÂ phi-Vv, the moment capacity must be reduced to account for shear-moment interaction (same principle as AS 4100 Clause 5.12):
M_s_reduced = M_s ÃÂà(1 - (V* / phi-Vv - 0.6)ÃÂò / (0.4 - 0.6)ÃÂò)
For V* = 600 kN (69% of phi-Vv): V*/phi-Vv = 0.69 > 0.6 âÃÂàshear-moment interaction applies. M_s_reduced = 1,283 ÃÂà(1 - (0.69 - 0.6)ÃÂò / 0.16) = 1,283 ÃÂà(1 - 0.0081/0.16) = 1,283 ÃÂà(1 - 0.0506) = 1,218 kNÃÂ÷m Reduction: 5% — minor for this section and loading.
Deflection — Shrinkage and Creep Effects (AS 2327 Clause 5.2)
Composite beam deflections must account for:
- Construction-stage deflection — steel beam self-weight + wet concrete (non-composite)
- Long-term deflection — superimposed dead load + live load (composite, with shrinkage/creep)
Shrinkage Curvature
Differential shrinkage between the concrete slab and steel beam induces curvature:
kappa_sh = epsilon_sh / (d/2 + t_c - y_bar_comp) ÃÂÃÂ alpha_e
where:
epsilon_sh = design shrinkage strain (typically 400-800 microstrain)
y_bar_comp = neutral axis depth of composite section
alpha_e = modular ratio adjustment for creep
For standard Australian concrete (32 MPa, normal weight):
- Total shrinkage (drying + autogenous): 500-700 ÃÂà10âÃÂûâÃÂö
- Long-term creep coefficient phi_cc = 2.0-3.0
- Effective modular ratio: n_eff = E_s / (E_c / (1 + phi_cc)) = 2n to 4n
Creep Effect
Creep increases the long-term deflection of composite beams:
delta_lt = delta_elastic + delta_creep + delta_shrinkage
delta_creep = delta_elastic ÃÂÃÂ phi_cc ÃÂÃÂ (G_seff / G_total)
delta_shrinkage = kappa_sh ÃÂàLÃÂò / 8
For a 12 m beam with delta_elastic = 15 mm, phi_cc = 2.5, and sustained load ratio of 0.6: delta_creep = 15 ÃÂÃÂ 2.5 ÃÂÃÂ 0.6 = 22.5 mm delta_elastic + delta_creep = 37.5 mm
AS 2327 Clause 5.2 limits total deflection to L/300 (40 mm for 12 m span) and incremental deflection (after construction) to L/500 (24 mm). For this example, long-term deflection of 37.5 mm exceeds L/500, so the beam requires either more pre-camber or increased section size.
Construction Stage Checks
Before the concrete has cured, the steel beam alone must support:
- Steel beam self-weight
- Wet concrete weight (includes the slab + deck profile weight)
- Construction live load (typically 0.5 kPa)
- Steel decking weight
Construction Stage Design Check
For the 530UB92.4 with 3.0 m spacing, 12 m span, 130 mm total slab depth (120 mm above deck + 60 mm rib, average 150 mm concrete thickness):
Concrete weight: 0.150 ÃÂÃÂ 25 = 3.75 kPa ÃÂÃÂ 3.0 m = 11.25 kN/m Steel: 0.92 kN/m Construction live: 0.5 kPa ÃÂÃÂ 3.0 m = 1.5 kN/m
Total construction load: 11.25 + 0.92 + 1.5 = 13.67 kN/m
M_construction = 13.67 ÃÂà12ÃÂò / 8 = 246 kNÃÂ÷m phi-Ms_bare = 640 kNÃÂ÷m âÃÂàOK (38% utilisation)
Delta_construction = 5 ÃÂà11.25 ÃÂà12000âÃÂô / (384 ÃÂà200,000 ÃÂà460 ÃÂà10âÃÂö) = 5 ÃÂà11.25 ÃÂà2.07 ÃÂà10ÃÂùâÃÂö / (384 ÃÂà200,000 ÃÂà460 ÃÂà10âÃÂö) = 1.164 ÃÂà10ÃÂùâÃÂø / (3.53 ÃÂà10ÃÂùâÃÂö) = 33 mm
L/300 = 40 mm âÃÂà33 mm OK for construction. Pre-camber of 25 mm recommended for long-term control.
Worked Example — Composite Floor Beam Design
Problem: Design a composite floor beam for a 12 m ÃÂÃÂ 9 m bay in an office building.
Design Parameters:
- Span: 12.0 m, beam spacing: 3.0 m (3 bays of 9.0 m, beams at 3.0 m)
- Slab: 120 mm concrete above 60 mm trapezoidal deck, total depth 180 mm (average 150 mm)
- Concrete: f_c = 32 MPa, density 24 kN/mÃÂó, normal class
- Steel beam: 530UB92.4 (Grade 300)
- Steel deck: 1.0 mm trapezoidal, 60 mm rib
- Loads (G = dead, Q = live), office per AS 1170.1
- Fire rating: 90 minutes (beam requires fire protection)
- Shear studs: 19 mm ÃÂÃÂ 100 mm, Grade 450, through-deck welded
Loads: Dead loads: Slab (0.150 ÃÂÃÂ 25) = 3.75 kPa, steel deck = 0.12 kPa, services/ceiling = 0.50 kPa, steel beam (per m) = 0.92 kN/m Live loads: Office = 3.0 kPa (AS 1170.1 Table 3.1), partitions = 0.5 kPa
Ultimate Load (ULS — 1.2G + 1.5Q): w = 1.2 ÃÂÃÂ (3.75 + 0.12 + 0.50) + 1.5 ÃÂÃÂ (3.0 + 0.5) = 1.2 ÃÂÃÂ 4.37 + 1.5 ÃÂÃÂ 3.5 = 5.24 + 5.25 = 10.49 kPa Beam load: w_beam = 10.49 ÃÂÃÂ 3.0 + 1.2 ÃÂÃÂ 0.92 = 31.47 + 1.10 = 32.57 kN/m
M* = 32.57 ÃÂà12ÃÂò / 8 = 586.3 kNÃÂ÷m V* = 32.57 ÃÂà12 / 2 = 195.4 kN
Composite Moment Capacity: T_s = 11,800 ÃÂà300 = 3,540 kN C_c = 0.85 ÃÂà32 ÃÂà3000 ÃÂà120 = 9,792 kN a = 3,540,000 / (0.85 ÃÂà32 ÃÂà3000) = 43.4 mm (PNA in slab) M_s = 3,540 ÃÂà(0.264 + 0.120 - 0.0217) = 3,540 ÃÂà0.3623 = 1,283 kNÃÂ÷m phi-Ms = 0.90 ÃÂà1,283 = 1,155 kNÃÂ÷m 586.3 âÃÂä 1,155 âÃÂàOK (51% utilisation)
Shear Check: phi-Vv = 0.90 ÃÂà0.60 ÃÂà300 ÃÂà528 ÃÂà10.2 / 1000 = 872 kN 195.4 âÃÂä 872 âÃÂàOK (22% utilisation)
Shear Stud Design: Full shear connection — calculate required studs to develop T_s = 3,540 kN. phi-Vsc per 19 mm stud = 0.80 ÃÂà0.65 ÃÂà(361 ÃÂàâÃÂÃÂ(32 ÃÂà28,600)) / 1000 = 179.6 kN (in solid slab) Through-deck reduction: k_deck = 0.85 (AISC-recommended for 60 mm rib, 19 mm stud) phi-Vsc_reduced = 0.85 ÃÂà179.6 = 152.7 kN per stud
N_scf (each side of midspan) = 3,540 / 152.7 = 23.2 âÃÂà24 studs per side = 48 studs total Stud spacing: 12,000 mm span / 24 = 500 mm centres Minimum: 6 stud diameters = 114 mm, maximum: 900 mm (Clause 3.2.4)
Partial shear check: N_sc = 20 per side (eta_c = 0.83 > 0.4 minimum): M_sp = 640 + 0.83 ÃÂà(1,283 - 640) = 640 + 534 = 1,174 kNÃÂ÷m phi-Msp = 0.90 ÃÂà1,174 = 1,057 kNÃÂ÷m âÃÂàOK (55% utilisation)
Deflection Check: Construction stage: delta_0 = 33 mm (above). Pre-camber 25 mm recommended. Superimposed dead: 0.50 kPa ÃÂÃÂ 3.0 m + 0.5 kPa partitions ÃÂÃÂ 3.0 m = 1.5 + 1.5 = 3.0 kN/m (sustained) Live load: 3.0 kPa ÃÂÃÂ 3.0 m = 9.0 kN/m (transient)
Short-term composite I: I_c âÃÂà1,800 ÃÂà10âÃÂö mmâÃÂô (approximate for 530UB + 3000 mm slab) Delta_live = 5 ÃÂà9.0 ÃÂà12000âÃÂô / (384 ÃÂà200000 ÃÂà1800 ÃÂà10âÃÂö) = 8.1 mm L/500 = 24 mm âÃÂàOK
Long-term delta (including creep, phi_cc = 2.5): Delta_lt = 33 (construction) + 1.3 (steel DL) + 5.2 (superimposed) + 8.1 (live) = 47.6 mm L/300 = 40 mm âÃÂàRequires pre-camber of 15 mm to satisfy.
Result: 530UB92.4 composite beam with 20 studs per side (19 mm ÃÂà100 mm), partial shear connection (eta_c = 0.83), 15 mm pre-camber, satisfies AS 2327. Beam capacity: phi-Ms = 1,057 kNÃÂ÷m (conservative, using partial shear).
Educational reference only. Verify against AS 4100 and relevant standards. Results are PRELIMINARY — NOT FOR CONSTRUCTION.
Design Resources
Calculator tools
- Beam Bending and Shear Calculator
- Beam Displacement and Sag Tool
- Beam Calculator — SFD, BMD & Reactions
- Beam Optimizer — Find Most Efficient Section
- Beam Span Table Tool
Design guides