| 16 | 201 | 25 | 57.8 | 41.8 | 49.2 | | 16 | 201 | 30 | 63.3 | 45.8 | 53.8 | | 19 | 284 | 25 | 81.7 | 59.1 | 69.4 | | 19 | 284 | 30 | 89.5 | 64.7 | 76.1 | | 19 | 284 | 35 | 96.7 | 69.9 | 82.2 | | 22 | 380 | 25 | 109.3 | 79.0 | 92.9 | | 22 | 380 | 30 | 119.8 | 86.6 | 101.8 |
Stud Capacity per Clause 17.7
For 19 mm stud, f'c = 30 MPa, solid slab: Asc = pi ÃÂÃÂ 19^2 / 4 = 283.5 mm^2 Ec = 4500 ÃÂÃÂ sqrt(30) = 24,650 MPa qr = 0.5 ÃÂÃÂ 0.80 ÃÂÃÂ 283.5 ÃÂÃÂ sqrt(30 ÃÂÃÂ 24,650) ÃÂÃÂ 1.0 ÃÂÃÂ 1.0 / 1000 = 89.5 kN
Metal Deck Effects
Deck Rib Orientation
| Deck Orientation relative to beam | R_g | R_p | Capacity Factor |
|---|---|---|---|
| Beams parallel to deck span (deck ribs parallel to beam) | 1.0 | 0.75 | 0.75 |
| Beams perpendicular to deck span | 0.85 | 0.75 | 0.64 |
| Solid slab (no deck) | 1.0 | 1.0 | 1.00 |
Deck Rib Geometry Limits
Per CSA S16 Clause 17.7.3:
| Parameter | Limit |
|---|---|
| Minimum rib width | 50 mm |
| Minimum stud height above top flange | 40 mm |
| Minimum concrete cover above deck | 15 mm |
| Maximum stud diameter | 22 mm (rarely exceeded) |
| Maximum stud spacing | 900 mm (or 4 ÃÂÃÂ slab thickness) |
Stud Layout Requirements
Per CSA S16 Clause 17.7.3:
Longitudinal Spacing
| Parameter | Minimum | Maximum |
|---|---|---|
| Stud spacing along beam | 6 ÃÂÃÂ stud diameter (114 mm for 19 mm) | 900 mm |
| Stud spacing transverse | 4 ÃÂÃÂ stud diameter (76 mm for 19 mm) | Deck rib spacing |
| Stud to beam flange edge | 25 mm | — |
Transverse Placement
For beams in metal deck:
- One stud per rib: For decks with 50-75 mm rib width, small beams
- Two studs per rib (staggered): For decks with 75-150 mm rib width, high shear demand
- Three studs per rib: Rare — requires rib width > 150 mm
Degree of Shear Connection
Per CSA S16 Clause 17.7.1:
Full shear connection: The number of studs provided develops the full plastic moment of the composite section.
N_full = C_f / qr
Where:
- C_f = total compressive force at full composite action = min(As ÃÂÃÂ Fy, 0.85 ÃÂÃÂ f'c ÃÂÃÂ b_eff ÃÂÃÂ t_slab)
- As = steel beam area
- b_eff = effective slab width
- t_slab = slab thickness
Partial Shear Connection
Per CSA S16 Clause 17.7.4, partial shear connection is permitted provided:
- Degree of connection âÃÂÃÂ¥ 40% for beams with span âÃÂä 10 m
- Degree of connection âÃÂÃÂ¥ 50% for beams with span > 10 m
- The reduced moment capacity M_r_partial is calculated from the available shear connection force: M_r_partial = M_s + (M_r_full - M_s) ÃÂÃÂ N_studs / N_full
Where M_s = moment resistance of steel section alone.
Worked Example — Composite Floor Beam
Given: W410ÃÂÃÂ60 beam, 350W steel. Span = 9.0 m. Solid slab 150 mm thick, f'c = 30 MPa, normal-weight concrete. Effective width b_eff = 2.25 m. Factored moment Mf = 600 kNÃÂ÷m.
Step 1 — Full Shear Connection: As = 7,550 mm^2 (W410ÃÂÃÂ60) C_f_steel = As ÃÂÃÂ Fy = 7,550 ÃÂÃÂ 350 / 1000 = 2,643 kN C_f_concrete = 0.85 ÃÂÃÂ 30 ÃÂÃÂ 2,250 ÃÂÃÂ 150 / 1000 = 8,606 kN C_f = min(2643, 8606) = 2,643 kN (steel governs — neutral axis in slab)
Step 2 — Studs Required (Full Connection): qr = 89.5 kN per stud (19 mm dia, f'c = 30 MPa, solid slab) N_full = 2,643 / 89.5 = 29.5 âÃÂà30 studs (15 each side of midspan, for each half-span)
Step 3 — Check Partial Connection: 40% minimum: N_min = 0.40 ÃÂÃÂ 30 = 12 studs total 60% partial: N = 18 studs (9 per side) Shear force: C_actual = 18 ÃÂÃÂ 89.5 = 1,611 kN
Step 4 — Reduced Moment Capacity (Partial Connection): Steel section alone: Mr_s = phi ÃÂàZx ÃÂàFy = 0.90 ÃÂà1,060 ÃÂà350 / 10^6 = 334 kNÃÂ÷m Full composite: Mr_full (from section analysis) âÃÂà850 kNÃÂ÷m (typical for W410ÃÂÃÂ60 with 150 mm slab) Mr_partial = 334 + (850 - 334) ÃÂà18/30 = 334 + 516 ÃÂà0.60 = 334 + 310 = 644 kNÃÂ÷m
Step 5 — Check: Mf = 600 kNÃÂ÷m âÃÂä Mr_partial = 644 kNÃÂ÷m. Ratio = 0.93. OK.
Result: 18-19 mm diameter headed studs (9 per side of midspan), full span. Partial shear connection at 60%.
Stud Welding Requirements
Per CSA W59 Clause 5.20, shear studs must be welded with:
- Stud welding gun: Automatic arc stud welding, ferrule-contained
- Weld qualification: 3 bend tests per CWB W47.1 procedures
- Daily testing: 2 stud bend tests at start of each shift
- Production testing: 10% of studs (min 2) bent 30ÃÂð from vertical after installation — if no failure, all studs are acceptable. If failure occurs, double the test frequency.
Frequently Asked Questions
What is the shear capacity of a 19 mm headed stud in 30 MPa concrete? Per CSA S16 Clause 17.7: qr = 0.5 ÃÂÃÂ phi_sc ÃÂÃÂ Asc ÃÂÃÂ sqrt(f'c ÃÂÃÂ Ec) ÃÂÃÂ R_g ÃÂÃÂ R_p. For solid slab: qr = 89.5 kN. For metal deck perpendicular: qr = 0.5 ÃÂÃÂ 0.80 ÃÂÃÂ 284 ÃÂÃÂ sqrt(30 ÃÂÃÂ 24,650) ÃÂÃÂ 0.85 ÃÂÃÂ 0.75 / 1000 = 64.7 kN (28% reduction from solid slab).
What is the minimum stud spacing for composite beams per CSA S16? 6 ÃÂÃÂ stud diameter in the longitudinal direction (114 mm for 19 mm studs). 4 ÃÂÃÂ stud diameter in the transverse direction (76 mm for 19 mm). Minimum edge distance from the beam flange edge: 25 mm. Maximum spacing: 900 mm or 4 ÃÂÃÂ slab thickness, whichever is less.
What is partial shear connection in composite beams? Partial shear connection means fewer studs are provided than required for full composite action. The degree of shear connection (N/N_full) ranges from 40-100%. The moment resistance is reduced proportionally: Mr_partial = Mr_steel + (Mr_full - Mr_steel) ÃÂÃÂ N/N_full. Partial connection is economical for beams where the moment demand is less than the full composite capacity.
Does the metal deck orientation affect stud capacity? Yes. Per CSA S16 Clause 17.7, the stud reduction factors depend on deck orientation. For beams perpendicular to deck span: R_g = 0.85, R_p = 0.75 (overall factor 0.64). For beams parallel to deck span: R_g = 1.0, R_p = 0.75 (overall factor 0.75). Solid slab (no deck): R_g = 1.0, R_p = 1.0. Beams perpendicular to deck have 15% less capacity than parallel beams due to non-uniform concrete confinement in the deck ribs.
Related Pages
- Canadian Composite Column Design
- CSA S16 Beam Design
- Canadian HSS Section Properties
- CSA S16 Lateral-Torsional Buckling
- Beam Capacity Calculator
- All Canadian References
This page is for educational reference. Shear stud design per CSA S16:24 Clause 17 and CSA W59 Clause 5.20. Verify stud welding procedure qualification per CWB. Results are PRELIMINARY — NOT FOR CONSTRUCTION without independent PE/SE verification.